About Clark Tracks

HIGH PERFORMANCE FOR MAXIMUM WORK LIFE

Nestling in a misty glen in the Lowlands of Scotland, the Clark Tracks factory is a busy place, where the best Forest Machine Tracks in the World are built. A mysterious land of snow-capped mountains, heather strewn moorland and vast forests. Where Bravehearts have taken up mighty swords and fought, shoulder to shoulder, for their freedom. The ancient battles are long over, and the swords have been laid down, but our advantage in building tracks, as with the historical battles with swords, is in the tradition of using superior quality steel and the knowledge of heat treatment, that has been passed down through the generations. 

Within the Dumfries factory, huge figures with bushy ginger beards and black-out welding masks communicate in a gruff language, indecipherable to anyone not from Scotland. Their arms are as big as your legs, their legs like the trunks of an oak tree! These are not descendants of some Legendary Loch Ness Monster, but craftsmen that have a finesse and attention to detail belying their monstrous physiques.  This is the team that assemble Clark Tracks; super-strong, ultra-tough and totally dependable – exactly the characteristics we build into our tracks. This is the Team that have proudly engineered performance and durability into the greatest tracks for markets across the globe.

Whatever terrain you need to conquer, we will be provide you the best equipment and we will be there, standing right by your side. 

Clark Tracks: Strong, Tough, Dependable and Unrivalled Customer Support

HISTORY

1988

First Tracks as part of Clark Engineering.

2004

Clark Tracks emerges from Clark Engineering as a standalone company.

2007

Clark Tracks leave the Clark family ownership and becomes part of Gunnebo Industries.

2009

Move to new site (Factory 1, 1500sqrm) in Dumfries town.

2010

New heater and press line commissioned.

2012

Expansion in to adjacent unit (Factory 2, 1500sqrm).

2013

New C-Link heater and Former commissioned.

2015

New Paint line commissioned.

2019

Expansion in to adjacent unit. Additional 3000sqrm of production space and larger office space.

2019

Robot welding cell delivered.

2020

Second heater and press line commissioned.